ROPP CAPPING MACHINE INSTALLATION READINESS CHECKLIST ==================================================== Project: Site: Machine / line reference: Review date: LAYOUT AND ACCESS - Approved floor plan and machine orientation: - Infeed and outfeed conveyor heights / widths: - Bottle flow direction: - Operator loading position: - Changeover, cleaning and maintenance access: - Removal route for major service parts: - Delivery route, doorways and lifting plan: PACKAGING AND PROCESS - Approved bottle and closure references: - Product condition at capping: - Neck-cleanliness control: - Cap supply and replenishment route: - Upstream filler interface: - Downstream inspection / coding / labelling interface: - Accumulation and blocked-line strategy: UTILITIES AND CONTROLS - Project electrical supply and isolator: - Project compressed-air requirement, if applicable: - Network / data / remote-support requirement, if applicable: - Emergency-stop and interlock boundaries: - Line ready / run / stop / fault signal schedule: - Local risk assessment and guarding review owner: HANDOVER - FAT action list closed or transferred: - Installation checks defined: - Site acceptance test plan approved: - Operator and maintenance training attendees: - Manuals, drawings and change-parts list available: - Production samples and test instruments available: All dimensions, utilities, risk controls and acceptance values must be confirmed for the actual project.