ROPP CAP FEEDER INTERFACE CHECKLIST ================================== Project: Customer: Date: Prepared by: CLOSURE EVIDENCE - Closure supplier and reference: - Cap diameter / height: - Liner and insert details: - Pilfer-band / bridge design: - Decoration or surface-finish restrictions: - Production closure samples supplied and lot identified: Yes / No FEEDING REQUIREMENT - Required replenishment method: - Bulk-cap storage expectation: - Preferred orientation method, if already defined: - Required cap buffer or chute capacity method: - Cap-present / cap-low / jam sensing required: - Manual recovery and safe access requirements: MACHINE INTERFACE - Cap transfer point: - Bottle-present / no-bottle-no-cap logic: - Capper stop signal to feeder: - Feeder ready / fault signal to capper: - Line stop, restart and low-cap response to demonstrate: - Change parts and labelled settings required: TRIAL AND ACCEPTANCE - Representative cap lots supplied: - Scuffing / decoration acceptance method: - Misorientation and double-cap checks: - Replenishment test: - Controlled stop and restart test: - Jam recovery test: - Timed run condition and reject definition: - Deviations / actions / owner / due date: This blank checklist does not define project-specific safety, performance or acceptance values.